ユーザ名 パスワード   → パスワード紛失 → 新規登録

投稿数ランキング

1 valakaz 9829
2 wangkiky 8855
3 lw789 870
4 wq123 566
5 huangbao1 424

攻略チャート

攻略支援情報

データベース

装備データ

オンライン状況

36 人のユーザが現在オンラインです。 (18 人のユーザが フォーラム を参照しています。)

登録ユーザ: 0
ゲスト: 36

もっと...


FF12RW情報提供 : Smelting and charging of electric furnace

投稿者 トピック
wangkiky
大長老
  • 登録日: 2016-1-8
  • 居住地:
  • 投稿: 8855
Smelting and charging of electric furnace
Requirements for loading: to shorten the time, to ensure the yield of the alloy elements, to reduce the power consumption and to increase the lining of the furnace
Before loading, the batching workers should be carefully proportioning according to the requirements of the planned furnace number and steel type. According to the requirements of different steel technology, the burden should be carefully analyzed and calculated and the ingredients are accurately proportioning. Therefore, it is necessary to confirm the composition and alloy composition of the iron and steel material needed before loading, and check the measuring instruments, so as to ensure the proper chemical composition and accurate weight after melting, so as to facilitate the smooth operation of smelting.Aluminum Cast House for melting furnace and casting line
In order to achieve the density, it is necessary to rely on the reasonable collocation of large, medium and small furnace materials. The furnace material is dense, can be obtained once, and can improve the conduction and heat transfer performance of the furnace material. When the electrode is well, the arc is stable and is beneficial to melting. Usually, the charge is less than 10kg is called small material, 10~25kg material is more than 50kg, called aniseed. When loading, the furnace material of different capacity electric furnace has different size requirements, but the maximum of the furnace material must not exceed the 1/50 of the total burden of the furnace.
Overseas Service Providing Resistance Type Metal Material Vacuum Tempering Furnace
The cloth is more important, generally is part of small material miscellaneous iron installed in the basket bottom, above the small material, the center part of the charging basket loaded aniseed or refractory material, intermediate small fill material, so smooth and non porous, so that is conducive to conductive, and electrode broken bridge and eliminate material to prevent the collapse of material. The rest of the small and medium-sized material installed in refractory material or aniseed on and around. At the end of the material, the heavy load of 0.02%~0.03% was loaded on the upper part of the basket to help the arc, stabilize the current and reduce the radiation damage to the cover of the furnace.Electron beam vacuum welding machine



valakaz
大長老
  • 登録日: 2018-3-13
  • 居住地:
  • 投稿: 9829
Re: Smelting and charging of electric furnace
ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324
ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324
ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324
ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324
ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324
ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324
ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324ap324


FF12レヴァナント・ウイングは(株)SQUARE ENIXの登録商標、もしくは商標です。
Copyright © 2007 ff12rw.hocolamogg.com, All Rights Reserved.